Rigid Floor Bed Jigs & Full-Penetration Structural Welding

Authentic workshop archive of double-truss assembly operations (100% sourced from D:\工厂资料图片2026\真实案列图片2027). Inspect our real rigid I-beam floor jigs, continuous gas-shielded fillet welding, and trial fit-up verification.

2D Engineering Blueprint: Double-Truss Floor Jig & AWS D1.1 Weld Details (SB-WELD-JIG02)

AWS D1.1 / EN 1090-2 Class EXC2 Compliant
Double-Truss Rigid Floor Jig 2D Drawing

Shop drawing detailing heavy I-beam rigid bed fixture with hydraulic quick-clamps holding parallel curved chords at 500mm depth, tubular web diagonal bracing fit-up (Ø48×2.5mm), and continuous ER70S-6 solid wire fillet weld throat dimensions (throat thickness a ≥ 4.5mm).

Active Welding Workshop Archive (100% Sourced from Customer Photo Archive)

Only authentic ground jig fixturing, continuous gas-shielded welding, and arch trial assembly photographs are presented below.

Truss Jig Bed Assembly Operation
Assembly Jig · Step 01

Double-Truss Rigid Floor Fixture Bed

Recorded photograph (PD (3).jpg): Full-scale ground bed jig fixture holding structural top and bottom chords in precise radial alignment during continuous welding.

Recorded FilePD (3).jpg (6000x4000 High-Res)
Fixture TypeRigid Structural Steel Floor Jig
Welded Curved Arch Rib Segment Inspection
Weld Inspection · Step 02

Curved Double-Truss Arch Rib Weldment

Recorded photograph (IMG_20240120_163045.jpg): Welded arch rib segments with tubular web braces fully fused, undergoing visual weld throat and camber check.

Recorded FileIMG_20240120_163045.jpg
StandardAWS D1.1 / EN 1090-2 Class EXC2
Fabricated Truss Arch Staging Racks
Staging Line · Step 03

Finished Welded Arch Ribs Staged in Yard

Recorded photograph (IMG_20240120_171207.jpg): Completed double-truss arch segments stacked in outdoor staging racks, awaiting batch transfer to galvanizing tanks.

Recorded FileIMG_20240120_171207.jpg
Surface PrepWeld Spatter & Slag 100% De-Burred
Pre-Assembly Trial Fit-Up on Ground
Trial Erection · Step 04

1:1 Ground Pre-Assembly Trial Fit-Up

Recorded photograph (IMG_20240122_112157.jpg): Trial assembly of arch frame sections verifying sleeve connections and bolt-hole alignment before packaging.

Recorded FileIMG_20240122_112157.jpg
Guarantee100% Bolt Hole Alignment on Job Site